Skip to content
evidenceevidencedigitalFederal Criminal TrialLangly Gee’s email and table on March 2014 Edison quality control failuresIn his March 28 email, Gee reported that 26 percent of Edison quality control runs had failed that month. The table breaks down failure rates by assay and lists the numbers of low- and high-level control runs.
← All Evidence
Digital Evidence

Langly Gee’s email and table on March 2014 Edison quality control failures

The table reports March 2014 quality control failure rates for Edison assays.

AdmittedFederal Criminal TrialGovernment Exhibit 1633
2 proceedings2 mentions1 trial

About

In his March 28 email, Gee reported that 26 percent of Edison quality control runs had failed that month. The table breaks down failure rates by assay and lists the numbers of low- and high-level control runs.

Government Exhibit 1633 · United States v. Holmes, N.D. Cal. No. 5:18-cr-00258-EJD · Court exhibit release, page 1
Government Exhibit 16331 of 2
Page 1 of Government Exhibit 1633: Government Exhibit 1633 contains March 2014 Edison assay quality-control failure data

Government Exhibit 1633 · United States v. Holmes, N.D. Cal. No. 5:18-cr-00258-EJD · Court exhibit release, page 1

Trial Record (2)